Jardine River Upgrade – 1995
Jardine River Upgrade – 1995

Jardine River Upgrade – 1995

Replace existing town water supply pumps and pipe work without interruption to town water supply to approx 6000 residents. Work completed on behalf of DNR & M Qld.Upgrade includes all electricals, telemetry controls and recording devices. All pipe work and flanging rated table F.

Hopevale Foundation – 2013
Hopevale Foundation – 2013

Hopevale Foundation – 2013

The Hopevale Foundation banana farm project consisted of the setup of a water supply system for the packing shed from a bore system. The system would feed into tanks and be boosted into the troughs through spray bars.This project allowed the local workers to increase the farm capacity to become self sufficient.

Ibis Dam Solar System – 2014
Ibis Dam Solar System – 2014

Ibis Dam Solar System – 2014

The job entailed the installation of a solar unit to recirculate the lost water back into the dam. PIMS was contacted by Mareeba Shire Council and asked if we could find a solution to their problem. We made a small dam to collect the water and installed a submersible solar system to pump the water back into the dam

Woorabinda Town Water Supply – 2014
Woorabinda Town Water Supply – 2014

Woorabinda Town Water Supply – 2014

Woorabinda Aboriginal Shire Council approached PIMS to replace the old pump and pipework system along with SCADA control for the town water supply. The pipework was replace with new poly pipework and electrofusion welds.

Tichum Creek Water Supply Upgrade – 2014
Tichum Creek Water Supply Upgrade – 2014

Tichum Creek Water Supply Upgrade – 2014

Boral quarries asked PIMS to replace an old water line with 110mm poly pipe with electrofusion welds to feed their crushing plant at Tichum Creek.

 

Malanda Water Upgrade – 2014
Malanda Water Upgrade – 2014

Malanda Water Upgrade – 2014

The Tablelands Regional council asked PIMS to install a new water supply system for Malanda. PIMS installed three submersible pump systems to feed into a common tank. Two Grundfos Pumps then pumped from the tank and into the town mains. the system involved SCADA communications to speak with the main control system used by the Council.

Mareeba Shire Council Parks Reticulation Upgrade – 2014
Mareeba Shire Council Parks Reticulation Upgrade – 2014

Mareeba Shire Council Parks Reticulation Upgrade – 2014

Mareeba Shire Council asked PIMS to install irrigation systems at three parks across Mareeba and a new lot at the Mareeba Cemetery. PIMS designed, supplied and installed the new reticulation systems at the four locations.